BED |
Burlington Electric Department
|
|
CVPS |
Central Vermont Public Service
|
|
Docket 7081 |
Vermont Public Service Board case in which the VSPC was established
|
|
DPS |
Vermont Department of Public Service, the ratepayer advocate before the Public Service Board
|
|
DSM |
Demand side management, actions taken to reduce or change the timing of electric energy consumption by consumers
|
|
EEU |
Energy Efficiency Utility, the entity contracted with the Public Service Board to provide electric energy efficiency services statewide
|
|
GMP |
Green Mountain Power
|
|
kV |
Kilovolts, a measure of electrical potential that equals 1,000 volts
|
|
Least cost integrated planning |
A "least cost integrated plan" for a regulated electric or gas utility is a plan for meeting the public's need for energy services, after safety concerns are addressed, at the lowest present value life cycle cost, including environmental and economic costs, through a strategy combining investments and expenditures on energy supply, transmission and distribution capacity, transmission and distribution efficiency, and comprehensive energy efficiency programs. 30 V.S.A. § 218c(1)
|
|
LRTP |
Long Range Transmission Plan
|
|
MOU |
Memorandum of Understanding or settlement
|
|
MVAR |
MegaVAR. VAR stands for Volt-Amperes Reactive, which is a measure of reactive power
|
|
NTA |
Non-transmission alternative.
|
|
PSB |
Vermont Public Service Board
|
|
PV20 |
The transmission line that extends from Milton, Vermont, to Plattsburgh, New York
|
|
RFP |
Request for proposal
|
|
SPEED |
Sustainably Priced Energy Enterprise Development, a program established in Title 30, Subsection 8005 of the Vermont Statutes
|
|
T&D |
Transmission and distribution
|
|
V.S.A. |
Vermont Statutes Annotated
|
|
VELCO |
Vermont Electric Power Company
|
|
VSPC |
Vermont System Planning Committee
|
|
Last modified at 3/6/2008 6:27 PM by System Account
|
|