The loss of the West Rutland-Blissville 115 kV line would cause unacceptable low voltage locally. This reliability deficiency is a CVPS subsystem issue. The transmission solution examined in the analysis conducted thus far is to install 16.2 MVAR of capacitor banks at Blissville. CVPS will apply the NTA screening tool to the project to determine whether it is applicable to the VSPC process.
The map at the left shows roughly the area of the state potentially affected by this reliability deficiency.