7/31/2023
|
PUC Public Member Appointment, 7/31/23
|
Correspondence |
Final |
5/31/2023
|
Letter to PUC regarding public member seat openings
|
Correspondence |
Final |
1/30/2023
|
2022 VSPC Annual Report
|
Report |
Final |
11/8/2022
|
2022 Geographic Targeting Recommendations, 11/8/2022
|
Correspondence |
Final |
7/7/2022
|
PUC Public Member Appointments, 7/7/2022
|
Notice |
Final |
4/28/2022
|
Letter to PUC regarding public member seats
|
Correspondence |
Final |
1/31/2022
|
2021 VSPC Annual Report
|
Report |
Final |
11/8/2021
|
VSPC Geographic Targeting Recommendations, 11/8/2021
|
Correspondence |
Final |
2/8/2021
|
2020 VSPC Annual Report
|
Report |
Final |
11/16/2020
|
VSPC Geographic Targeting Recommendations, 11/16/2020
|
Correspondence |
Final |
5/5/2020
|
Letter to PUC re: Regional Planning Seat
|
Correspondence |
Final |
1/31/2020
|
2019 VSPC Annual Report
|
Report |
Final |
10/29/2019
|
VSPC Geographic Targeting Recommendations, 10/29/2019
|
Correspondence |
Final |
4/18/2019
|
PUC Supply Seat Appointments, 4/18/2019
|
Correspondence |
Final |
4/2/2019
|
PUC memo on supply resources candidates, 4/2/2019
|
Other |
Final |
2/27/2019
|
VSPC request to fill supply resource vacancies
|
Correspondence |
Final |
2/14/2019
|
PUC order adopting VSPC GT recommendations 2/14/2019
|
Correspondence |
Final |
2/5/2019
|
2018 VSPC Annual Report
|
Report |
Final |
10/29/2018
|
VSPC Geographic Targeting Recommendations, 10/29/2018
|
Correspondence |
Final |
7/17/2018
|
PUC press release re: VSPC public member appts, 7/17/2018
|
Public Outreach |
Final |
7/16/2018
|
PUC public member letter of appt for Jeff Forward, 7/16/2018
|
Correspondence |
Final |
7/13/2018
|
PUC Public Member Appointments, 7/13/2018
|
Correspondence |
Final |
7/9/2018
|
PUC memo re: additional public member candidate, 7/9/2018
|
Other |
Final |
7/5/2018
|
Docket 7081 MOU as amended Dkt 8875, 2018
|
Materials |
Final |
7/2/2018
|
PUC memo on public member candidates, 7/2/2018
|
Other |
Final |
6/29/2018
|
PUC Memo re candidates for public member seats, 6/29/2018
|
Other |
Final |
6/13/2018
|
8875 PUC order re: creation of a planning seat on VSPC, 6/13/2018
|
Other |
Final |
6/12/2018
|
PUC notice of VSPC public member openings
|
Other |
Final |
5/30/2018
|
VSPC request to fill public member vacancies
|
Correspondence |
Final |
3/13/2018
|
Docket 8875 comments of Windham Regional Planning Commission
|
Correspondence |
|
3/8/2018
|
2018 VT Long-Range Transmission Draft 2, 3/8/18
|
Report |
Draft |
3/8/2018
|
2018 VT LR Transmission Plan, EVT comments
|
Other |
Final |
2/9/2018
|
Docket 8875: VSPC proposed amendments to 7081 MOU
|
Other |
|
1/29/2018
|
2017 VSPC Annual Report
|
Report |
Final |
1/25/2018
|
PUC order adding Planning rep to VSPC, 1/25/17
|
Notice |
Final |
1/9/2018
|
Materials: PUC order adopting VSPC GT recommendations, 1/
|
Materials |
Final |
10/23/2017
|
VSPC Geographic Targeting Recommendations, 10/23/2017
|
Correspondence |
Final |
3/31/2017
|
PSB Memo Re: appointments to VSPC public positions
|
Correspondence |
Final |
3/3/2017
|
PSB Order re GT recommendations
|
Correspondence |
Final |
1/31/2017
|
Docket 8875 input letter to PSB, 1/31/2017
|
Correspondence |
|
1/31/2017
|
VSPC Annual Report, 2016 activities
|
Report |
Final |
1/9/2017
|
Docket 8875 request for extension of comment deadline
|
Correspondence |
Final |
12/27/2016
|
PSB Order opening Docket 8875 re: planning seat
|
Other |
Final |
11/23/2016
|
Opportunity to comment of VSPC GT recs
|
Other |
|
10/24/2016
|
2017 VSPC GT Recommendations to Public Service Board
|
Correspondence |
Final |
10/18/2016
|
PSB opportunity to comment on VSPC candidates
|
Correspondence |
Final |
10/13/2016
|
PSB Order seeking comment on GMP Hinesburg Reliability Plan
|
Other |
Final |
9/30/2016
|
Materials: GMP Hinesburg Reliability Plan, 9/30/2016
|
Materials |
Final |
7/20/2016
|
VSPC Charter Glossary, 7/20/2016
|
Charter |
Final |
7/20/2016
|
VSPC Charter, 7/20/2016
|
Charter |
Final |
7/13/2016
|
Forecast Zones, rev 2016
|
Materials |
Final |
3/18/2016
|
PSB request for comments on GMP reliability plan extension
|
Correspondence |
Final |
3/17/2016
|
GMP request for extension, Hinesburg Reliability Plan
|
Correspondence |
Final |
2/15/2016
|
2015 VSPC Annual Report
|
Report |
Final |
1/22/2016
|
PSB Order re GT recommendations
|
Correspondence |
Final |
11/9/2015
|
PSB memo, opp to comment on VSPC GT recs
|
Correspondence |
Final |
10/23/2015
|
2016 VSPC GT Recommendations to Public Service Board
|
Correspondence |
Final |
7/17/2015
|
Solar Siting Task Force Appointment email
|
Correspondence |
Final |
4/1/2015
|
GMP Rutland Reliability Plan, 4/1/2015
|
Report |
Final |
2/2/2015
|
2014 VSPC Annual Report
|
Report |
Final |
10/30/2014
|
2015 VSPC GT Recommendations to Public Service Board
|
Correspondence |
Final |
8/18/2014
|
Docket 8073 compliance filing, 8/18/2014
|
Correspondence |
Final |
6/19/2014
|
ISO-NE Consumer Liaison Group Election Notice
|
Materials |
|
4/19/2014
|
Appt of supply seat, 4/19/2014
|
|
|
4/2/2014
|
GMP reliability plan cover letter
|
Correspondence |
Final |
4/2/2014
|
GMP Rutland area reliability plan
|
Report |
Final |
4/2/2014
|
GMP St. Albans reliability plan
|
Report |
Final |
3/3/2014
|
PSB request for VSPC comments on Supply seat candidates
|
Correspondence |
Final |
2/14/2014
|
2013 VSPC Annual Report
|
Report |
Final |
2/7/2014
|
St. Albans Reliability Plan
|
Report |
Final |
1/24/2014
|
PSB Order re GT process
|
Report |
Final |
11/7/2013
|
7873/7874 Screening Framework Comments Memo
|
Correspondence |
Final |
11/6/2013
|
D 8073 PSB Order creating Supply Resources seat on VSPC
|
|
Final |
11/6/2013
|
PSB D 8073 order creating Supply Resource seat on VSPC
|
Report |
Final |
11/6/2013
|
Amended D7081 MOU
|
Report |
Final |
11/5/2013
|
PSB request for comments on VSPC GT recommendations
|
Correspondence |
Final |
11/5/2013
|
7873/7874 Screening Framework Redline
|
Report |
Final |
10/31/2013
|
VSPC 2014 Geographic Targeting Recommendations
|
Correspondence |
Final |
10/4/2013
|
GT process improvement cover letter
|
Correspondence |
Final |
10/4/2013
|
GT Process Improvement Memo
|
Report |
Final |
10/4/2013
|
GT Process Map
|
Report |
Final |
10/4/2013
|
GT Process Coordination Graphic
|
Report |
Final |
10/4/2013
|
GT 3-yr cycle process map
|
Report |
Final |
9/27/2013
|
PSB_ltr_ScreeningFramework7873_7874_DistributionAdded.pdf
|
Correspondence |
Final |
8/22/2013
|
D8073 VELCO proposal
|
Report |
Final |
8/8/2013
|
PSB standard offer memo
|
Correspondence |
Final |
7/15/2013
|
Request for extension of time for recruitment of altnerate public member granted
|
Correspondence |
Final |
7/10/2013
|
Order opening investigation to add seat to VSPC
|
Report |
Final |
7/3/2013
|
Ltr to PSB requesting extension
|
Correspondence |
Draft |
5/24/2013
|
Ltr to PSB re REV request for appointment
|
Correspondence |
Final |
5/2/2013
|
PSB Memo Re: request from Renewable Energy Vermont for VSPC public member position
|
Correspondence |
Final |
4/26/2013
|
PSB appointment of new members d 4262013
|
Correspondence |
Final |
4/1/2013
|
Utility Analysis (Reliability Plan) 4/1/2013
|
Report |
Final |
3/26/2013
|
Memo from PSB Requesting comments on candidates for appointment to VSPC public positions
|
Correspondence |
Final |
3/20/2013
|
Letters from potential candidates for VSPC membership
|
Correspondence |
Final |
3/12/2013
|
Interim Appointment of Johanna Miller 3 12 2013
|
|
Final |
3/12/2013
|
Interim appointment Scudder Hervey 3 12 13
|
|
Final |
3/1/2013
|
Temp Appointments
|
Correspondence |
Final |
2/14/2013
|
Ltr to PSB re: Appt of public members
|
Correspondence |
Final |
2/12/2013
|
VSPC 2012 Annual Report
|
Report |
Final |
1/29/2013
|
MOU Final Filing Jan 2013
|
Report |
Final |
1/22/2013
|
7081MOU_rev_effective012213.pdf
|
Report |
Final |
12/27/2012
|
VSPC GT recommendations
|
Correspondence |
Final |
12/15/2012
|
ProjectUpdateTemplate.doc
|
Correspondence |
Draft |
11/14/2012
|
D 7873 Group A -- Rutland
|
Report |
Draft |
11/14/2012
|
D 7873 Group A -- Hartford
|
Report |
Draft |
11/14/2012
|
D 7873 Work Group A -- Intro slides
|
Report |
Draft |
11/14/2012
|
D 7873 Working Group A -- NTA Study Group Preso
|
Report |
Draft |
10/23/2012
|
Ltr to PSB Re Recommendation Re Funding Sources for GT of EE
|
Correspondence |
Final |
9/27/2012
|
Ltr requesting more time to file GT funding recommendations
|
Correspondence |
Final |
9/27/2012
|
Filing w PSB revised NTA screening tool
|
Correspondence |
Final |
8/29/2012
|
Amended Docket 7081 MOU filing with PSB
|
Correspondence |
Final |
8/23/2012
|
VSPC Preso to SPEED workshop
|
Report |
Final |
8/1/2012
|
Order approving and clarifying amends to Docket 7081
|
Report |
Final |
7/30/2012
|
Follow-up ltr to PSB re Board Order of 1-30-12
|
Correspondence |
Final |
7/6/2012
|
Geotargeting funding issues status report from VSPC EE&F d. 070612
|
Report |
Final |
6/29/2012
|
2012 VT Long-Range Transmission Plan
|
Report |
Final |
4/30/2012
|
Response to Board Order of 1 30 2012
|
Correspondence |
Final |
3/22/2012
|
2012 LRTP w VSPC input v5 Clean
|
Report |
Draft |
3/22/2012
|
2012 LRTP w VSPC Input v5 redline
|
Report |
Draft |
2/10/2012
|
PSB ltr 02 10 2012 Comments on Closing Docket 7081
|
Correspondence |
Final |
1/30/2012
|
PSB Order on Revisions to 7081 MOU
|
Report |
Final |
1/27/2012
|
VELCO 2012 LRTP - VSPC Draft of 1-27-2012
|
Report |
Draft |
1/26/2012
|
2012 Annual Report Filing
|
Report |
Final |
1/20/2012
|
PSB Memo d 1 20 2012 granting extension to file Annual Report
|
Correspondence |
Final |
1/12/2012
|
VSPC Ltr to PSB requesting ext for annual report
|
Correspondence |
Final |
12/19/2011
|
Letter to PSB w VSPC GT Recommendations
|
Correspondence |
Final |
12/13/2011
|
DPS Comments on 7081 MOU Amendments 12132011
|
|
Final |
11/29/2011
|
PSB Memo Requesting Comment in 7081 Amendments
|
Correspondence |
|
11/21/2011
|
Filing to Amend MOU in Docket 7081
|
Report |
Final |
9/30/2011
|
Memo Re GT VSPC Schedule.pdf
|
Correspondence |
Final |
9/21/2011
|
Geographical Targeting of EE, VSPC proposed schedule
|
Correspondence |
Final |
8/23/2011
|
Geotargeting Proposed Schedule
|
Correspondence |
Final |
4/27/2011
|
PSB Appointment of Miller & Scudder
|
Correspondence |
Final |
4/11/2011
|
Invitation to ISO to June 15, 2011, mtg
|
Correspondence |
Final |
4/6/2011
|
Georgia NTA Study, La Capra Associates, Exec Summary
|
Report |
Final |
4/5/2011
|
VNRC letter to PSB re: VSPC membership
|
Correspondence |
Final |
4/1/2011
|
VSPC public participation.pdf
|
Correspondence |
Final |
3/10/2011
|
Letter to PSB Re Herve Scudder Public Member
|
Correspondence |
Final |
2/17/2011
|
Memo from PSB
|
Correspondence |
Final |
1/24/2011
|
VEIC responses on Unconstrained Potential Study
|
Correspondence |
Final |
1/19/2011
|
REVISED F20 Unconstrained 01 20 11FINAL.ppt
|
Report |
Final |
1/18/2011
|
VELCO PPL modification
|
Correspondence |
Final |
1/18/2011
|
2011 VSPC annual report
|
Report |
Final |
11/30/2010
|
CHP and Customer Gen Potential Study
|
Report |
Draft |
11/10/2010
|
CHP study Appendix E - Input Assumptions and Data Sources.pdf
|
Report |
Final |
11/10/2010
|
CHP study Appendix F - Customer-Sized Renewable Energy_Peak Reduction Generation Metrics (by Load Zone).pdf
|
Report |
Final |
11/10/2010
|
CHP study Appendix G1 - CHP Metrics (by Load Zone) Base Case - Charts.pdf
|
Report |
Final |
11/10/2010
|
CHP study Appendix H1 - CHP Metrics (by Load Zone) Sensitivity Analysis - Charts.pdf
|
Report |
Final |
11/10/2010
|
CHP study Appendix H2 - CHP Metrics (by Load Zone) Sensitivity Analysis - Data.pdf
|
Report |
Final |
11/10/2010
|
CHP study Appendix I - Vermont Speed Price Chart.pdf
|
Report |
Final |
11/10/2010
|
CHP study Appendix J - Summary of Load Data by Zone.pdf
|
Report |
Final |
11/10/2010
|
CHP study Appendix D - Customer Generation Characteristics (Stantec CHP Technology Details).pdf
|
Report |
Final |
11/10/2010
|
CHP study Appendix G2 - CHP Metrics (by Load Zone) Base Case - Data.pdf
|
Report |
Final |
11/10/2010
|
CHP study Appendix B - List of Existing CHP Facilities.pdf
|
Report |
Final |
11/10/2010
|
CHP study Appendix C - Existing CHP Site Interviews.pdf
|
Report |
Final |
11/10/2010
|
CHP study Appendix K - Customer Sited Renewable Generation Screening Results.pdf
|
Report |
Final |
11/10/2010
|
CHP study Appendix A - Map of Vermont Load Zones.pdf
|
Report |
Final |
10/5/2010
|
PSB Order on Forecast 20 Spending
|
Report |
Final |
9/29/2010
|
VELCO comments on FERC transmission planning NOPR
|
Report |
Final |
9/22/2010
|
Order re Revision to Paragraph 64 of MOU
|
Report |
Final |
8/18/2010
|
Memo from PSB Re F20 Spending Issues
|
Correspondence |
Final |
7/29/2010
|
PSB Board Order Approving Cost Allocation
|
Report |
Final |
7/14/2010
|
Memo DRP and F20 Budgeting
|
Correspondence |
Final |
6/29/2010
|
Informational Filing to Extend Deadlines pursuant to para 51 of MOU
|
Correspondence |
Final |
6/25/2010
|
VSPC CHP/Customer-Sited Generation Potential RFP
|
Report |
Final |
6/10/2010
|
Response to PSB Memo of 51710 on Evaluation of Docket 7081
|
Correspondence |
Final |
5/17/2010
|
PSB Memo Re: Evaluation
|
Correspondence |
Final |
4/15/2010
|
Dock 7081 Sole Source Contract.pdf
|
Correspondence |
Final |
4/6/2010
|
Comments on Northfield's 31910 Ltr
|
Correspondence |
Final |
3/30/2010
|
Request for Modification to MOU
|
Correspondence |
Final |
2/11/2010
|
2010 Project Priority List
|
Report |
Final |
2/11/2010
|
Ltr to PSB filing Project Priority List
|
Correspondence |
Final |
2/11/2010
|
Ltr to DPS submitting 2010 Annual Report
|
Correspondence |
Final |
2/11/2010
|
Ltr to PSB filing 2010 Annual Report
|
Correspondence |
Final |
2/11/2010
|
2010 Annual Report
|
Report |
Final |
2/8/2010
|
Letter with NDA to PSB
|
Correspondence |
Final |
1/21/2010
|
Order regarding Modification of Schedule to File Annual Report
|
Correspondence |
Final |
1/14/2010
|
PSB Memo Re deadline for comments on VSPC request for extentison
|
Correspondence |
Final |
1/13/2010
|
ORDER RE MODIFICATION OF SCHEDULE FOR NORTH RUTLAND/COLD RIVER PROJECT
|
|
Final |
1/13/2010
|
Ltr to PSB Re: Request for Extension to File Annual Rpt
|
Correspondence |
Final |
12/22/2009
|
2009 12 22 CVPS Letter to PSB regarding Cold River Project (Corrected 12-22-09).pdf
|
Correspondence |
Final |
12/21/2009
|
Evaluation
|
Report |
Final |
12/21/2009
|
Letter to PSB re Evaluation
|
Correspondence |
Final |
12/10/2009
|
Final Affected Utility Determination
|
Report |
Final |
12/10/2009
|
F20 Final Report.pdf
|
|
|
12/8/2009
|
Forecast 20 Final Report w/ Appendices & Comments
|
Report |
Final |
9/3/2009
|
Letter from ISO-NE Confirming 9 30 09 Mtg
|
Correspondence |
Final |
8/25/2009
|
Ltr CVPS to PSB
|
Correspondence |
Final |
7/23/2009
|
Invitation to ISO for 9/30/09 meeting
|
Correspondence |
Final |
6/25/2009
|
Letter to 7081 Parties Re: Evaluation
|
Correspondence |
Final |
4/29/2009
|
CVPS Ltr to PSB Re: Cold River Road Project
|
Correspondence |
Final |
4/7/2009
|
VSPC Outline of 3-25-09 Workshop
|
Report |
Final |
3/6/2009
|
Workshop with VSPC on March 25, 2009
|
Correspondence |
Final |
2/27/2009
|
Letter to PSB re: workshop format
|
Correspondence |
Final |
2/25/2009
|
Order Re: Modication of Dates St. Albans/Georgia
|
Report |
Final |
1/27/2009
|
Memo from PSB Re: Updated Guidance to the EEU Regarding Planning Assumptions for F20
|
Correspondence |
Final |
1/26/2009
|
Letter
|
Correspondence |
Final |
1/26/2009
|
Letter to DPS
|
Correspondence |
Final |
1/26/2009
|
2009 Annual Report
|
Report |
Final |
1/9/2009
|
Memorandum
|
Correspondence |
Final |
1/7/2009
|
Letter to PSB Requesting Extension to File Annual Report
|
Correspondence |
Final |
1/6/2009
|
PSB Memo dated 1/6/09
|
Correspondence |
Final |
1/6/2009
|
PSB Memo dated 1/6/09
|
Correspondence |
Final |
12/8/2008
|
Background Info on VSPC
|
Correspondence |
Final |
9/15/2008
|
VSPC recs on geotargeting
|
Correspondence |
Final |
9/11/2008
|
PSB letter to ISO
|
Correspondence |
Final |
9/3/2008
|
PSB Geotargeting Request
|
Correspondence |
Final |
8/20/2008
|
Letter re: Geotargeting
|
Correspondence |
Final |
8/18/2008
|
Towns Take Note: New Approach to Electric System Planning in Vermont
|
Report |
Final |
7/24/2008
|
Response to 7/15/08 letter
|
Correspondence |
Final |
7/15/2008
|
Letter to ISO-NE
|
Correspondence |
Final |
7/10/2008
|
PSB Order approving modified dates
|
|
Final |
7/10/2008
|
Order Re: Modification of Dates in MOU Attachment F
|
Report |
Final |
7/2/2008
|
Ltr from CVPS to PSB Re: Docket 7081
|
Correspondence |
Final |
6/27/2008
|
Letter to PSB Re: Request for modification of dates in Attachment F of MOU
|
Correspondence |
Final |
6/23/2008
|
PSB Memo Docket 7081 dated 62308
|
Correspondence |
Final |
6/20/2008
|
Information Management Protocol
|
Report |
Final |
6/20/2008
|
Operating emergency generators during grid capacity deficiency
|
Correspondence |
Final |
6/20/2008
|
Amended Rules, redline
|
Report |
Final |
6/20/2008
|
NTA screening tool
|
Report |
Final |
6/20/2008
|
Cover letter to June 20, 2008 PSB filings
|
Correspondence |
Final |
6/20/2008
|
2008 Project Priority List
|
Report |
Final |
6/20/2008
|
Amended rules of procedure
|
Report |
Final |
3/24/2008
|
PSB request for comments on extension request
|
Correspondence |
Final |
3/19/2008
|
Request for extension for filing info mgt protocol
|
Correspondence |
Final |
2/1/2008
|
VSPC input on DSM forecasting by EEU
|
Correspondence |
Final |
2/1/2008
|
Zone Forecast Map
|
Correspondence |
Final |
1/15/2008
|
2008 VSPC Annual Report
|
Report |
Final |
12/4/2007
|
Procedural Rules of the VSPC
|
Report |
Final |
7/31/2007
|
Proposal for allocation of VSPC costs
|
Correspondence |
Final |
|
Directions to Langevin House.pdf
|
|
|
|
Forecast Zone Map
|
Report |
Draft |
|
Directions to Langevin House.doc
|
Report |
Draft |
|
VTC Map to the Langevin House
|
Report |
Final |
|
Project-Specific Action Plan Template
|
|
Draft |
|
Public Participation Subcommittee Charter, 3/10/2010
|
Materials |
Final |